I'm a Builder or developer

Wastewater network standards

Standards for pipelines typically less than 300mm nominal diameter.

About these standards

The wastewater local network covers the collection system to carry wastewater from each property to the wastewater transmission system. The peak dry weather flow is generally less than 78 litres per second.

These standards are for pipelines typically less than 300mm nominal diameter. Local networks that are larger in diameter may need to add input during design, or to follow the standard details in wastewater transmission. We will evaluate these requirements on a case-by-case basis.



Design

Document name: CoP wastewater only

Document number: COP-02

Revision number: 2.2

Revision date: 1/11/2019

Description: Watercare code of practice for land development and subdivision – wastewater only.


Document name: Wastewater pumping stations for networks

Document number: ESF-500-STD-202

Revision number: 2.0

Revision date: 07/06/2024

Description: Design and construction standard for local network wastewater pumping stations.


Document name: Safety in design guide

Document number: DP-10

Revision number: 1

Revision date: 1/03/2017

Description: Design safety and risk management across the life cycle of an asset.


Document name: Architectural design guidelines

Document number: DP-12

Revision number: 1

Revision date: 08/06/2020

Description: Processes and design considerations for the architectural aspects of above ground water and wastewater infrastructure.


Document name: Vacuum wastewater standard

Document number: DP-17

Revision number: 0.5

Revision date: 27/11/2018

Description: Working draft design principles for wastewater vacuum systems.


Document name: Organisational physical security standard

Document number: ESF-500-STD-406

Revision number: 1

Revision date: 19/02/2024

Description: Standard for physical security control measures required at sites and buildings to protect Watercare property, information and people.




Drawings

Document name: Access structure drawings for wastewater infrastructure

Document number: DW05

Revision number: 1

Revision date: 10/08/2016

Description: Access structures used in wastewater transmission areas. Drawing set includes access doors, standard manhole lids, pipe bridge safety barriers, hatches and platforms in manholes.


Document name: Access structure general drawings for public/non-public areas

Document number: DW07

Revision number: 1

Revision date: 19/08/2016

Description: Handrail details for public/non-public areas.


Document name: Code of practice for land development and subdivision - wastewater drawing set

Document number: DW01

Revision number: 2.1

Revision date: 12/08/2019

Description: Wastewater drawing set for network, subdivision and land development application. Limited to pipe diameter 300mm.


Document name: Wastewater pumping station drawings for networks

Document number: DW03

Revision number: 1

Revision date: 19/08/2016

Description: Typical detail and layout for network wastewater pumping stations. To be read with electrical drawing set DW18.



Construction

Document name: General civil construction standard

Document number: CG

Revision number: 1.1

Revision date: 19/06/2019

Description: General civil activities such as earthworks, pipe material construction, other building.


Document name: General mechanical construction standard

Document number: ESF-600-STD-701

Revision number: 2.1

Revision date: 01/10/2025

Description: General mechanical construction standard including installation and quality control requirements.


Document name: Odour control biofilter (441)

Document number: WW-08

Revision number: 1

Revision date: 1/10/2014

Description: Construction of a biofilter to deodorise foul air extracted from a wastewater facility. Does not include supply of the air-handling fan or sump pump, or the electrical works associated with the fan, pump or any other controls.


Document name: HSE standard

Document number: HSE

Revision number: 1.1

Revision date: 30/09/2019

Description: General health and safety and environmental control practices for Watercare construction sites. Users are still required to complete site-specific items in contract conditions and site-specific specifications.


Document name: Code of Practice for Commissioning

Document number: ESF-700-STD-801

Revision number: 2.0

Revision date: 25/06/2024

Description: Standard to complete commissioning works of infrastructure including mechanical, process, instrumentation and electrical works.


Document name: Gravity sewer pipe rehabilitation: General requirements for the installation of lining systems

Document number: ESF-600-STD-206

Revision number: 1.0

Revision date: 17/03/2025

Description: General requirements for the design and installation of lining systems for gravity sewer pipelines.


Document name: Gravity sewer pipe rehabilitation: CIPP - performance specification guideline

Document number: ESF-600-STD-207

Revision number: 1.0

Revision date: 17/03/2025

Description: Requirements for the design and installation of CIPP lining.


Document name: Gravity sewer pipe rehabilitation: Spiral wound lining - performance specification guideline

Document number: ESF-600-STD-208

Revision number: 1.0

Revision date: 17/03/2025

Description: Requirements for the design and installation of spiral wound lining.


Document name: Gravity sewer pipe rehabilitation: Slip lining - performance specification guideline

Document number: ESF-600-STD-209

Revision number: 1.0

Revision date: 17/03/2025

Description: Requirements for the design and installation of slip lining.


Document name: Gravity sewer pipe rehabilitation: Fold and form - performance specification guideline

Document number: ESF-600-STD-210

Revision number: 1.0

Revision date: 17/03/2025

Description: Requirements for the design and installation of fold and form lining.


Document name: Gravity sewer pipe rehabilitation: Pipe segment lining - performance specification guideline

Document number: ESF-600-STD-211

Revision number: 1.0

Revision date: 17/03/2025

Description: Requirements for the design and installation of pipe segment lining.

Templates

Document name: QA templates for general civil construction standards

Document number: TMPL-08

Revision number: 1.1

Revision date: 19/06/2019

Description: QA/QC templates for general civil construction standard.


Document name: QA templates for mechanical construction standards

Document number: TMPL-09

Revision number: 1.1

Revision date: 19/06/2019

Description: QA/QC templates for mechanical construction standard.


Document name: Safety in design risk WSL register

Document number: TMPL-19

Revision number: 1

Revision date: 4/11/2021

Description: Template to complete safety in design risk assessment.


Document name: Wastewater pumping stations network - FD

Document number: ESF-500-TMP-201

Revision number: 1

Revision date: 07/06/2024

Description: Functional description template for the operation of network wastewater pump stations


Document name: Commissioning Index

Document number: ESF-700-ITP-801

Revision number: 1

Revision date: 25/06/2024

Description: Index and section reference for commissioning requirements.


Document name: Pre-commissioning ITRs template

Document number: ESF-700-ITP-802

Revision number: 1

Revision date: 25/06/2024

Description: Pre-commissioning requirements and checklist template.


Document name: Installation completion ITRs template

Document number: ESF-700-ITP-803

Revision number: 1

Revision date: 25/06/2024

Description: Inspection and testing requirements template including acceptance criteria. To be used in conjunction with Watercare's Code of Practice for Commissioning.


Document name: Tender level commissioning template

Document number: ESF-700-TMP-801

Revision number: 2

Revision date: 25/11/2024

Description: Commissioning plan template to assist with the tender process and meet the requirements of our Code of Practice for Commissioning.


Document name: Wastewater developer pump stations commissioning plan template

Document number: ESF-700-TMP-803

Revision number: 2

Revision date: 25/11/2024

Description: Commissioning plan template for wastewater developer pump station projects. It should be modified to suit projects.

These are the current standards. If you require a previous standard, please contact us.

  • Phone: (09) 442 2222, press 4