Electrical standards

Standards for connecting to the electrical system.

About these standards

The electrical system covers the connection to an external power source, onsite power generation and the electrical system associated with water and wastewater facilities. The componentry includes switchgear, transformers, service panels and electrical or control equipment, telemetry and wiring.

Design

Document name: Electrical Design Standard

Document number: ESF-500-STD-702

Revision number: 3.0

Revision Date: 22/09/2025

Description: General electrical design requirements covering cables, transformers, switchboards, MCC, UPS, motors, cathodic protection, etc.

Document name: Cathodic protection standard

Document number: ESF-500-STD-704

Revision number: 1.0

Revision date: 03/09/2025

Description: General cathodic protection requirements for new and existing buried metallic pipelines



Document name: Safety in design guide

Document number: DP-10

Revision number: 1

Revision date: 1/03/2017

Description: Design safety and risk management across the life cycle of an asset.


Drawings

Document name: Cathodic protection installation details

Document number: ESF-500-FOR-710

Revision number: 1

Revision date: 28/08/2025

Description: Standard drawings for cathodic protection test station details.


Document name: Magnetic flowmeter Endress and Hauser

Document number: DW24

Revision number: 1

Revision date: 03/05/2019

Description: Mechanical and control cable installation details for Endress and Hauser magnetic flowmeters; buried and in chambers.


Document name: Bulk supply meter electrical and control drawing set

Document number: DW20

Revision number: 1.2

Revision date: 25/05/2021

Description: Template electrical drawing set for bulk supply meter locations. Includes civil layout of the control panel.


Document name: Electrical drawing set for automated line valves

Document number: DW19

Revision number: 1

Revision date: 06/09/2016

Description: Drawing set and template for electrical control of automated line valve installations. Includes details of the control panel civil installation.


Document name: Electrical drawings for treatment plants - Mangere wastewater treatment plant motor starters

Document number: DW21

Revision number: 1.1

Revision date: 22/06/2017

Description: Mangere wastewater treatment plant specific motor starter detail. Used for Mangere only. Refer to the general electrical drawing set for other sites or for DCS water treatment plants refer to DW22.


Document name: Electrical drawings for treatment plants – Water DCS sites motor control

Document number: DW22

Revision number: 1

Revision date: 06/09/2016

Description: For use with DCS sites only. Alternatively refer to the general electrical drawing details. For the Mangere treatment plant see DW21 above.


Document name: Electrical general drawing set

Document number: DW17

Revision number: 1.5

Revision date: 19/06/2019

Description: General template drawings and layouts for motor controls, instrument loop diagrams, UPS installation and switchboard.


Document name: Pump station electrical drawing set

Document number: DW18

Revision number: 1

Revision date: 02/09/2016

Description: Pumping station electrical drawing set, pump control, alarms, starters. See motor control drawings, document DW22 for water DCS sites.


Document name: Antenna pole details

Document number: ESF-500-FOR-709

Revision number: 1

Revision date: 13/12/2024

Description: Antenna pole details

Construction

Document name: Electrical Construction Standard

Document number: ESF-600-STD-703

Revision number: 3.0

Revision date: 22/09/2025

Description: General construction requirements for cables, transformers, switchboards, MCC, UPS, motors, cathodic protection etc.


Document name: HSE standard

Document number: HSE

Revision number: 1.1

Revision date: 30/09/2019

Description: General health and safety and environmental control practices for Watercare construction sites. Users are still required to complete site-specific items in contract conditions and site-specific specifications.


Document name: Code of Practice for Commissioning

Document number: ESF-700-STD-801

Revision number: 2.0

Revision date: 25/06/2024

Description: Standard to complete commissioning works of infrastructure including mechanical, process, instrumentation and electrical works.


Templates

Document name: QA templates for electrical construction standard

Document number: TMPL-15

Revision number: 2.1

Revision date: 27/07/2021

Description: Quality control templates for use with the general electrical construction standard.


Document name: Form templates for Code of Practice for Commissioning

Document number: TMPL-16

Revision number: 1

Revision date: 20/12/2016

Description: Templates for COP-03. For a Word version of this document please contact [email protected].


Document name: Safety in design risk WSL register

Document number: TMPL-19

Revision number: 1

Revision date: 4/11/2021

Description: Template to complete safety in design risk assessment.


Document name: Commissioning Index

Document number: ESF-700-ITP-801

Revision number: 1

Revision date: 25/06/2024

Description: Index and section reference for commissioning requirements.


Document name: Pre-commissioning ITRs template

Document number: ESF-700-ITP-802

Revision number: 1

Revision date: 25/06/2024

Description: Pre-commissioning requirements and checklist template.


Document name: Installation completion ITRs template

Document number: ESF-700-ITP-803

Revision number: 1

Revision date: 25/06/2024

Description: Inspection and testing requirements template including acceptance criteria. To be used in conjunction with Watercare's Code of Practice for Commissioning.


Document name: Tender level commissioning template

Document number: ESF-700-TMP-801

Revision number: 2

Revision date: 25/11/2024

Description: Commissioning plan template to assist with the tender process and meet the requirements of our Code of Practice for Commissioning.


Document name: Small projects commissioning plan template

Document number: ESF-700-TMP-802

Revision number: 2

Revision date: 25/11/2024

Description: Commissioning plan template for low complexity projects. It should be modified to suit projects.

These are the current standards. If you require a previous standard, please contact us.